Metro Line 1 (Ben Thanh – Suoi Tien)

Metro Line 1 (Ben Thanh – Suoi Tien)

Metro Line 1 (Ben Thanh – Suoi Tien)

  • Location: Ho Chi Minh City
  • Details: Spanning 19.7 kilometers with 14 stations, this metro line aims to reduce traffic congestion and modernize urban transit.
  • Arcadia's Role: Arcadia Infra Construction supports station construction, manpower, and system integration.
  • Timeline: Expected to become operational in 2025.
  •  

Comments are closed.